Preview · Enquiries are saved privately. Sales notifications are not connected.

PROCUREMENT CHECKLIST

An existing model or a new development?

The right starting point depends on how closely an available reference matches your garment. A change in colour is different from a change in cup geometry.

01

Compare an existing reference first

Share the reference model and the garment specification. Ask which sizes, colours and material combinations are available for that model. An existing listing does not mean every combination is currently in stock.

02

Describe what needs to change

Separate shape, dimensions, thickness, layers, colour and attachment requirements. List the non-negotiable details and the details that may be adjusted after sampling.

03

Confirm tooling and sampling conditions

Whether a new mould is needed, who owns it, the development scope, sample fees, revisions and timing must be assessed for the actual project. Do not treat another supplier’s process or cycle as a CUPNORA promise.

04

Approve a defined sample

Record the approved dimensions, materials, colour reference and attachment method together with the sample revision. Confirm bulk conditions only against the agreed specification.

Put the checklist to work.

Add your model, quantities, specification and delivery country to one requirement.

Prepare an enquiry

SOURCING NOTES

When should I request custom development?

Compare an existing reference with the garment first. List required changes in geometry, dimensions, material layers, thickness, colour and attachment separately. A colour change and a new cup geometry may have different tooling and sampling conditions, which are assessed for the project.